A permanent Atlantic cable lands at Heart's Content
node
The Great Eastern completed a cable from Foilhommerum Bay on Valentia Island to Heart's Content in Newfoundland, and it worked. The ship then returned to the position where the 1865 cable had been lost, grappled it from a seabed some kilometres deep, spliced it and completed it to the same village — so that two working cables ran between Ireland and Newfoundland within weeks of each other. The recovery is the first demonstration of the operation on which the entire repair industry still depends: finding a cable on the bottom by dragging for it, bringing an end aboard and splicing.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 4
- The Heart's Content cable stationconcerns
- The Valentia Island cable stationconcerns
- Cyrus West Fieldconcerns
- Locating and repairing a cable faultconcerns
Assembled narrative · 1
Assembled from 30 blocks · 1 evidence · 22 related
- Story
- The Great Eastern completed a cable from Foilhommerum Bay on Valentia Island to Heart's Content in Newfoundland, and it worked. The ship then returned to the position where the 1865 cable had been lost, grappled it from a seabed some kilometres deep, spliced it and completed it to the same village — so that two working cables ran between Ireland and Newfoundland within weeks of each other. The recovery is the first demonstration of the operation on which the entire repair industry still depends: finding a cable on the bottom by dragging for it, bringing an end aboard and splicing.
- Knowledge
- Locating and repairing a cable fault
- The Valentia Island cable station
- The Heart's Content cable station
- Cyrus West Field
- A permanent Atlantic cable lands at Heart's Content
- Connections
- The Heart's Content cable station
- The Valentia Island cable station
- Cyrus West Field
- Locating and repairing a cable fault
- The cable landing station
- A permanent Atlantic cable lands at Heart's Content
- The cable landing station
- The 1858 Atlantic telegraph cable
- The first Atlantic telegraph cable is completed
- A permanent Atlantic cable lands at Heart's Content
- The 1858 Atlantic telegraph cable
- The first Atlantic telegraph cable is completed
- A permanent Atlantic cable lands at Heart's Content
- The United Nations Convention on the Law of the Sea
- The cable ship
- Redundancy and restoration in the cable network
- A permanent Atlantic cable lands at Heart's Content
- Eleven cable ships repair the Luzon Strait cables
- Both cables to the Matsu Islands are cut within six days
- Evidence
- Supports the 1858 cable dates (completion 5 August, first test signals 10 August, first official message 16 August, failure 18 September), the message counts of the working period, the 1866 landing at Heart's Content and the recovery of the 1865 cable, and Cyrus Field's organising role. V55 verification basis: retrieved by search, not opened. This is a specialist enthusiast-maintained archive rather than an institutional one; it is the standard working reference for this subject and reproduces primary material, but a curator should replace it with institutional citations before publication.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVT_1866_CABLE_LANDS&experience=EVT_1866_CABLE_LANDS