A transatlantic cable is built to be short rather than large

node

Hibernia Express entered service between New York and London, the first new transatlantic cable in over a decade and the first designed primarily for low latency: routed as directly as the ocean allowed rather than by the conventional corridor, and marketed on a tested round-trip figure of better than 58.95 milliseconds between data centres in the two cities. The customers for the difference were financial trading firms. It is the cleanest available demonstration that the geography of a cable, not its capacity, is what sets the physical floor on how fast information can travel.

A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 1
Assembled narrative · 1

Assembled from 12 blocks · 1 evidence · 6 related

  1. Story
  2. Hibernia Express entered service between New York and London, the first new transatlantic cable in over a decade and the first designed primarily for low latency: routed as directly as the ocean allowed rather than by the conventional corridor, and marketed on a tested round-trip figure of better than 58.95 milliseconds between data centres in the two cities. The customers for the difference were financial trading firms. It is the cleanest available demonstration that the geography of a cable, not its capacity, is what sets the physical floor on how fast information can travel.
  3. Knowledge
  4. Latency as a physical quantity
  5. A transatlantic cable is built to be short rather than large
  6. Connections
  7. Latency as a physical quantity
  8. The submarine fibre-optic cable
  9. A transatlantic cable is built to be short rather than large
  10. SMW4 and IMEWE are cut near Jeddah
  11. Evidence
  12. Supports the September 2015 entry into service of the first transatlantic cable optimised for low latency and the tested 58.95 ms round-trip figure between named data centres in New York and London. V55 verification basis: retrieved in summary, not opened. This is a commercial performance claim by the operator and its data-centre partner, measured between specific facilities, and is not an independent measurement of a route.
Close the narrative
Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=EVT_HIBERNIA_EXPRESS_2015&experience=EVT_HIBERNIA_EXPRESS_2015