Singapore's water import agreement expires
node
The 1962 agreement under which Singapore draws raw water from the Johor river runs to 2061. The date is a contractual fact rather than a prediction, and it is the deadline against which NEWater, desalination and catchment expansion have been planned for six decades.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Assembled narrative · 1
Assembled from 20 blocks · 1 evidence · 14 related
- Story
- The 1962 agreement under which Singapore draws raw water from the Johor river runs to 2061. The date is a contractual fact rather than a prediction, and it is the deadline against which NEWater, desalination and catchment expansion have been planned for six decades.
- Knowledge
- Singapore
- NEWater
- Singapore's water import agreement expires
- Connections
- NEWater
- Singapore
- Singapore
- Urban water supply and sanitation
- Singapore brings NEWater into service
- Singapore's water import agreement expires
- The Strait of Malacca
- Urban housing supply
- NEWater
- Singapore brings NEWater into service
- Singapore's water import agreement expires
- Evidence
- Supports the four-source framework, NEWater's introduction in 2003, plant capacity meeting up to around 40 per cent of national water demand against a total demand on the order of two million cubic metres a day, and the 2061 expiry of the water agreement with Malaysia. V55 verification basis: retrieved from PUB and NLB summaries; no PUB annual report or the 1962 agreement text was consulted.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVT_SINGAPORE_WATER_AGREEMENT_2061&experience=EVT_SINGAPORE_WATER_AGREEMENT_2061