Artemis IV first crewed lunar south pole landing (planned)
node
Planned first crewed lunar landing of the Artemis programme and the first ever at the lunar south pole: four crew launch on SLS in Orion, two transfer to a commercial Human Landing System and descend for roughly a week of surface operations. A programme target, not a forecast.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 2
- Lunar South Pole Regionconcerns
- Orion (Multi-Purpose Crew Vehicle)concerns
Assembled narrative · 1
Assembled from 27 blocks · 1 evidence · 22 related
- Story
- Planned first crewed lunar landing of the Artemis programme and the first ever at the lunar south pole: four crew launch on SLS in Orion, two transfer to a commercial Human Landing System and descend for roughly a week of surface operations. A programme target, not a forecast.
- Knowledge
- Orion (Multi-Purpose Crew Vehicle)
- Lunar South Pole Region
- Artemis IV first crewed lunar south pole landing (planned)
- Connections
- Lunar South Pole Region
- Orion (Multi-Purpose Crew Vehicle)
- Shackleton Crater
- Cabeus Crater
- Lunar Water Ice
- LCROSS Centaur impacts the permanently shadowed floor of Cabeus crater
- NASA narrows candidate south polar landing regions to nine
- Artemis IV first crewed lunar south pole landing (planned)
- Artemis I
- Artemis II
- Apollo Lunar Module
- Artemis I launches uncrewed from Launch Complex 39B
- Artemis I splashes down after 25 days
- NASA concludes the Orion heat shield investigation
- Artemis II launches — first crew beyond low Earth orbit since 1972
- Artemis II splashes down off San Diego
- Artemis III crewed low Earth orbit demonstration (planned)
- Artemis IV first crewed lunar south pole landing (planned)
- Evidence
- NASA Administrator Jared Isaacman announced on 27 February 2026 that Artemis III will no longer attempt a lunar landing but will fly a crewed rendezvous and docking demonstration in low Earth orbit with SpaceX and Blue Origin Human Landing System test articles, targeted for 2027, and that the first crewed lunar landing moves to Artemis IV no earlier than 2028.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=E_ARTEMIS_IV_PLANNED&experience=E_ARTEMIS_IV_PLANNED