The first Atlantic telegraph cable is completed
node
The cable ships completed the laying of the 1858 cable between Valentia Island in Kerry and Trinity Bay in Newfoundland, having met in mid-ocean and paid out in opposite directions. Test signals passed from 10 August; on 16 August the first official message was sent — the directors' announcement that Europe and America were united by telegraph — and a widely publicised exchange between Queen Victoria and President Buchanan followed. For a few weeks a message could cross the Atlantic in minutes rather than in the ten or eleven days a fast ship took.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 3
- The 1858 Atlantic telegraph cableconcerns
- The Valentia Island cable stationconcerns
- Cyrus West Fieldconcerns
Assembled narrative · 1
Assembled from 25 blocks · 1 evidence · 12 related
- Story
- The cable ships completed the laying of the 1858 cable between Valentia Island in Kerry and Trinity Bay in Newfoundland, having met in mid-ocean and paid out in opposite directions. Test signals passed from 10 August; on 16 August the first official message was sent — the directors' announcement that Europe and America were united by telegraph — and a widely publicised exchange between Queen Victoria and President Buchanan followed. For a few weeks a message could cross the Atlantic in minutes rather than in the ten or eleven days a fast ship took.
- Knowledge
- The Valentia Island cable station
- The 1858 Atlantic telegraph cable
- Cyrus West Field
- The first Atlantic telegraph cable is completed
- Connections
- The 1858 Atlantic telegraph cable
- The Valentia Island cable station
- Cyrus West Field
- The Valentia Island cable station
- Cyrus West Field
- TAT-1
- The first Atlantic telegraph cable is completed
- The 1858 cable fails
- The cable landing station
- The 1858 Atlantic telegraph cable
- The first Atlantic telegraph cable is completed
- A permanent Atlantic cable lands at Heart's Content
- The 1858 Atlantic telegraph cable
- The first Atlantic telegraph cable is completed
- A permanent Atlantic cable lands at Heart's Content
- Evidence
- Supports the 1858 cable dates (completion 5 August, first test signals 10 August, first official message 16 August, failure 18 September), the message counts of the working period, the 1866 landing at Heart's Content and the recovery of the 1865 cable, and Cyrus Field's organising role. V55 verification basis: retrieved by search, not opened. This is a specialist enthusiast-maintained archive rather than an institutional one; it is the standard working reference for this subject and reproduces primary material, but a curator should replace it with institutional citations before publication.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVT_1858_CABLE_COMPLETED&experience=EVT_1858_CABLE_COMPLETED