The Ghan begins running on the Central Australia Railway
node
A passenger service reaches Alice Springs over the 1,067 mm narrow-gauge Central Australia Railway. The alignment crosses country subject to flash flooding and washaways, and the line acquires a reputation for delays measured in days rather than hours. It is the counter-example to this Journey's general rule: an alignment can be bad enough that it is not worth keeping, and this one was not.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Evidence · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 2
- The Ghanconcerns
- Track gauge as a colonial decisionconcerns
Assembled narrative · 1
Assembled from 22 blocks · 1 evidence · 9 related
- Story
- A passenger service reaches Alice Springs over the 1,067 mm narrow-gauge Central Australia Railway. The alignment crosses country subject to flash flooding and washaways, and the line acquires a reputation for delays measured in days rather than hours. It is the counter-example to this Journey's general rule: an alignment can be bad enough that it is not worth keeping, and this one was not.
- Knowledge
- The Ghan
- Track gauge as a colonial decision
- The Ghan begins running on the Central Australia Railway
- Connections
- The Ghan
- Track gauge as a colonial decision
- Track gauge as a colonial decision
- The Ghan begins running on the Central Australia Railway
- The last narrow-gauge Ghan leaves Marree
- The Ghan runs through to Darwin for the first time
- The Blue Train
- Rovos Rail
- The Ghan
- The Union Limited and Union Express begin running to the mail ships
- The Ghan begins running on the Central Australia Railway
- The last narrow-gauge Ghan leaves Marree
- Rovos Rail runs its first train
- Evidence
- Supports the Central Australia Railway as the Ghan's original 1,067 mm narrow-gauge alignment from 1929, its replacement by a standard-gauge line via Tarcoola in 1980, and the 2004 Darwin extension. V55 verification basis: the library collection was identified as an authority and the chronology was carried in attributed Australian rail-history summaries; slsa.sa.gov.au was not fetched.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVT_GHAN_FIRST_RUN_1929&experience=EVT_GHAN_FIRST_RUN_1929