Skip to content
RichseenAtlasAtlasSign in

The Ghan

node · earth · South Australia and the Northern Territory

The Adelaide–Alice Springs and, since 2004, Adelaide–Darwin service across central Australia. From August 1929 it ran on the Central Australia Railway, a 1,067 mm narrow-gauge line laid on a bad alignment through country subject to flash flooding and washaways. The answer was not to repair it but to abandon it: a new standard-gauge line was built well to the west via Tarcoola, and the last narrow-gauge Ghan left Marree on 25 November 1980. The extension north from Alice Springs to Darwin opened in January 2004, and the first through train left Adelaide on 1 February 2004, reaching Darwin on 3 February. It is the clearest case in this Journey of a route that was moved rather than inherited, because the original survey was simply wrong.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 1
Assembled narrative · 1

An assembled narrative is available for this object.

Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=ROUTE_GHAN