Skip to content
RichseenAtlasAtlasSign in

MAREA is completed across the Atlantic

node

Microsoft, Facebook and Telxius announced completion of a cable of about 6,600 km between Virginia Beach and Sopelana near Bilbao, with eight fibre pairs and an initial design capacity given as 160 Tbps. Two features mark the change of era: the owners are the companies whose services generate the traffic rather than carriers selling capacity, and the southern landfall deliberately avoids the crowded northern transatlantic corridor.

A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 2
Assembled narrative · 1

Assembled from 18 blocks · 1 evidence · 8 related

  1. Story
  2. Microsoft, Facebook and Telxius announced completion of a cable of about 6,600 km between Virginia Beach and Sopelana near Bilbao, with eight fibre pairs and an initial design capacity given as 160 Tbps. Two features mark the change of era: the owners are the companies whose services generate the traffic rather than carriers selling capacity, and the southern landfall deliberately avoids the crowded northern transatlantic corridor.
  3. Knowledge
  4. MAREA
  5. The shift of cable ownership to content providers
  6. MAREA is completed across the Atlantic
  7. Connections
  8. MAREA
  9. The shift of cable ownership to content providers
  10. TAT-8
  11. The shift of cable ownership to content providers
  12. MAREA is completed across the Atlantic
  13. MAREA
  14. 2Africa
  15. MAREA is completed across the Atlantic
  16. The core of 2Africa is completed
  17. Evidence
  18. Supports MAREA's landings at Virginia Beach and Sopelana near Bilbao, its length of about 6,600 km, its eight fibre pairs, its initial design capacity of 160 Tbps and the three-party ownership. V55 verification basis: retrieved in summary, not opened. This is a source announcing its own project; the 200 Tbps figure quoted elsewhere in trade coverage is a vendor trial result and is treated in this pack as demonstrated rather than contracted capacity.
Close the narrative
Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=EVT_MAREA_COMPLETED_2017&experience=EVT_MAREA_COMPLETED_2017