Completion of the MAREA transatlantic cable
evidence
Supports MAREA's landings at Virginia Beach and Sopelana near Bilbao, its length of about 6,600 km, its eight fibre pairs, its initial design capacity of 160 Tbps and the three-party ownership. V55 verification basis: retrieved in summary, not opened. This is a source announcing its own project; the 200 Tbps figure quoted elsewhere in trade coverage is a vendor trial result and is treated in this pack as demonstrated rather than contracted capacity.
A evidence is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Evidence · 0
This object cites no evidence.
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 0
Assembled narrative · 0
This object does not clear the publishing floor: an assembled narrative needs a description and at least one cited piece of evidence.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVIDENCE_EV_MICROSOFT_MAREA_2017