SEA-ME-WE 5 is ready for service
node
The nineteen-operator consortium brought into service a cable of about 20,000 km linking Singapore to France and Italy through seventeen countries, with an ultimate design capacity given as 24 Tbps. Its route is the Europe–Asia corridor in its standard form: Malacca, the Indian Ocean, the Bab el-Mandeb, the Red Sea, an overland crossing of Egypt, and the Mediterranean.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Evidence · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 4
- SEA-ME-WE 5concerns
- The Red Sea cable corridorconcerns
- The Egyptian cable land crossingconcerns
- The Strait of Malaccaconcerns
Assembled narrative · 1
Assembled from 36 blocks · 1 evidence · 23 related
- Story
- The nineteen-operator consortium brought into service a cable of about 20,000 km linking Singapore to France and Italy through seventeen countries, with an ultimate design capacity given as 24 Tbps. Its route is the Europe–Asia corridor in its standard form: Malacca, the Indian Ocean, the Bab el-Mandeb, the Red Sea, an overland crossing of Egypt, and the Mediterranean.
- Knowledge
- SEA-ME-WE 5
- The Red Sea cable corridor
- The Strait of Malacca
- The Egyptian cable land crossing
- SEA-ME-WE 5 is ready for service
- Connections
- SEA-ME-WE 5
- The Red Sea cable corridor
- The Egyptian cable land crossing
- The Strait of Malacca
- Malacca (Melaka)
- The Egyptian cable land crossing
- The Strait of Malacca
- The Red Sea cable corridor
- SEA-ME-WE 5 is ready for service
- SEA-ME-WE 5
- The cable chokepoint
- The Egyptian cable land crossing
- SEA-ME-WE 5 is ready for service
- A sinking ship's anchor severs Red Sea cables
- SMW4 and IMEWE are cut near Jeddah
- Porthcurno cable station
- SEA-ME-WE 5
- The Red Sea cable corridor
- Alexandria
- Telecom Egypt
- SEA-ME-WE 5 is ready for service
- Singapore
- SEA-ME-WE 5
- The cable chokepoint
- SEA-ME-WE 5 is ready for service
- Evidence
- Supports the ready-for-service date of 13 December 2016, the system length of about 20,000 km, the ultimate design capacity of 24 Tbps, the nineteen-operator consortium and the landing-point list used in this pack. V55 verification basis: retrieved in summary, not opened. Branch landings on this system have changed since 2016 and the list should be read as the system as commissioned, not as it stands today.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVT_SMW5_READY_2016&experience=EVT_SMW5_READY_2016