Skip to content
RichseenAtlasAtlasSign in

The Ghan

node · earth · South Australia and the Northern Territory

The Adelaide–Alice Springs and, since 2004, Adelaide–Darwin service across central Australia. From August 1929 it ran on the Central Australia Railway, a 1,067 mm narrow-gauge line laid on a bad alignment through country subject to flash flooding and washaways. The answer was not to repair it but to abandon it: a new standard-gauge line was built well to the west via Tarcoola, and the last narrow-gauge Ghan left Marree on 25 November 1980. The extension north from Alice Springs to Darwin opened in January 2004, and the first through train left Adelaide on 1 February 2004, reaching Darwin on 3 February. It is the clearest case in this Journey of a route that was moved rather than inherited, because the original survey was simply wrong.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 1
Assembled narrative · 1

Assembled from 19 blocks · 1 evidence · 9 related

  1. Story
  2. The Adelaide–Alice Springs and, since 2004, Adelaide–Darwin service across central Australia. From August 1929 it ran on the Central Australia Railway, a 1,067 mm narrow-gauge line laid on a bad alignment through country subject to flash flooding and washaways. The answer was not to repair it but to abandon it: a new standard-gauge line was built well to the west via Tarcoola, and the last narrow-gauge Ghan left Marree on 25 November 1980. The extension north from Alice Springs to Darwin opened in January 2004, and the first through train left Adelaide on 1 February 2004, reaching Darwin on 3 February. It is the clearest case in this Journey of a route that was moved rather than inherited, because the original survey was simply wrong.
  3. Knowledge
  4. The Ghan
  5. Track gauge as a colonial decision
  6. Connections
  7. Track gauge as a colonial decision
  8. The Ghan begins running on the Central Australia Railway
  9. The last narrow-gauge Ghan leaves Marree
  10. The Ghan runs through to Darwin for the first time
  11. The Blue Train
  12. Rovos Rail
  13. The Ghan
  14. The Union Limited and Union Express begin running to the mail ships
  15. The Ghan begins running on the Central Australia Railway
  16. The last narrow-gauge Ghan leaves Marree
  17. Rovos Rail runs its first train
  18. Evidence
  19. Supports the Central Australia Railway as the Ghan's original 1,067 mm narrow-gauge alignment from 1929, its replacement by a standard-gauge line via Tarcoola in 1980, and the 2004 Darwin extension. V55 verification basis: the library collection was identified as an authority and the chronology was carried in attributed Australian rail-history summaries; slsa.sa.gov.au was not fetched.
Close the narrative
Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=ROUTE_GHAN&experience=ROUTE_GHAN