The Ghan
node · earth · South Australia and the Northern Territory
The Adelaide–Alice Springs and, since 2004, Adelaide–Darwin service across central Australia. From August 1929 it ran on the Central Australia Railway, a 1,067 mm narrow-gauge line laid on a bad alignment through country subject to flash flooding and washaways. The answer was not to repair it but to abandon it: a new standard-gauge line was built well to the west via Tarcoola, and the last narrow-gauge Ghan left Marree on 25 November 1980. The extension north from Alice Springs to Darwin opened in January 2004, and the first through train left Adelaide on 1 February 2004, reaching Darwin on 3 February. It is the clearest case in this Journey of a route that was moved rather than inherited, because the original survey was simply wrong.
Read in · 1
Evidence · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 1
- Track gauge as a colonial decisionconstrained_by
Assembled narrative · 1
Assembled from 19 blocks · 1 evidence · 9 related
- Story
- The Adelaide–Alice Springs and, since 2004, Adelaide–Darwin service across central Australia. From August 1929 it ran on the Central Australia Railway, a 1,067 mm narrow-gauge line laid on a bad alignment through country subject to flash flooding and washaways. The answer was not to repair it but to abandon it: a new standard-gauge line was built well to the west via Tarcoola, and the last narrow-gauge Ghan left Marree on 25 November 1980. The extension north from Alice Springs to Darwin opened in January 2004, and the first through train left Adelaide on 1 February 2004, reaching Darwin on 3 February. It is the clearest case in this Journey of a route that was moved rather than inherited, because the original survey was simply wrong.
- Knowledge
- The Ghan
- Track gauge as a colonial decision
- Connections
- Track gauge as a colonial decision
- The Ghan begins running on the Central Australia Railway
- The last narrow-gauge Ghan leaves Marree
- The Ghan runs through to Darwin for the first time
- The Blue Train
- Rovos Rail
- The Ghan
- The Union Limited and Union Express begin running to the mail ships
- The Ghan begins running on the Central Australia Railway
- The last narrow-gauge Ghan leaves Marree
- Rovos Rail runs its first train
- Evidence
- Supports the Central Australia Railway as the Ghan's original 1,067 mm narrow-gauge alignment from 1929, its replacement by a standard-gauge line via Tarcoola in 1980, and the 2004 Darwin extension. V55 verification basis: the library collection was identified as an authority and the chronology was carried in attributed Australian rail-history summaries; slsa.sa.gov.au was not fetched.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=ROUTE_GHAN&experience=ROUTE_GHAN