Severomuysky Tunnel
node · earth · Severomuysky Range, Buryatia
At 15.3 km, the longest railway tunnel in Russia, carrying the Baikal–Amur Mainline under the Severomuysky Range in Buryatia. Driving it took roughly twenty-six years of intermittent work through faulted, water-bearing and partly frozen rock, and until it opened, BAM trains took a steep temporary bypass over the range that limited train weight and speed for the whole line. It is a clean demonstration of the ruling-gradient principle in reverse: the cost of the tunnel was justified entirely by what the bypass grade did to every train that used it.
Read in · 1
Evidence · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 1
- Baikal–Amur Mainline (BAM)part_of
Assembled narrative · 1
Assembled from 14 blocks · 1 evidence · 14 related
- Story
- At 15.3 km, the longest railway tunnel in Russia, carrying the Baikal–Amur Mainline under the Severomuysky Range in Buryatia. Driving it took roughly twenty-six years of intermittent work through faulted, water-bearing and partly frozen rock, and until it opened, BAM trains took a steep temporary bypass over the range that limited train weight and speed for the whole line. It is a clean demonstration of the ruling-gradient principle in reverse: the cost of the tunnel was justified entirely by what the bypass grade did to every train that used it.
- Knowledge
- Baikal–Amur Mainline (BAM)
- Severomuysky Tunnel
- Connections
- Baikal–Amur Mainline (BAM)
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Trans-Siberian Railway
- Permafrost as a track foundation
- Severomuysky Tunnel
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Evidence
- Supports the BAM's route, its permafrost exposure and the 15.3 km Severomuysky Tunnel as the longest railway tunnel in Russia. V55 verification basis: RZD's page was returned as a search result and its substance carried in the attributed summary; it was not fetched. RZD is the operator and therefore an interested party for anything about the line's performance.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=SITE_SEVEROMUYSKY_TUNNEL&experience=SITE_SEVEROMUYSKY_TUNNEL