Severomuysky Tunnel

node · earth · Severomuysky Range, Buryatia

At 15.3 km, the longest railway tunnel in Russia, carrying the Baikal–Amur Mainline under the Severomuysky Range in Buryatia. Driving it took roughly twenty-six years of intermittent work through faulted, water-bearing and partly frozen rock, and until it opened, BAM trains took a steep temporary bypass over the range that limited train weight and speed for the whole line. It is a clean demonstration of the ruling-gradient principle in reverse: the cost of the tunnel was justified entirely by what the bypass grade did to every train that used it.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 1
Assembled narrative · 1

An assembled narrative is available for this object.

Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.