ITER's declared target date for the start of deuterium-tritium operation
node
Under the baseline update presented in June 2024, the start of deuterium-tritium operation at ITER is a stated programme target of 2039, four years later than the 2016 reference baseline, with the start of research operations targeted for 2034 and full magnetic energy for 2036. This record exists to hold a declared target, not a forecast. ITER's dates have moved more than once and this Journey makes no claim about whether they will move again or be met.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 3
- ITERconcerns
- Tritiumconcerns
- Tritium breeding blanketconcerns
Assembled narrative · 1
An assembled narrative is available for this object.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVENT_ITER_DT_PHASE_TARGET