Skip to content
RichseenAtlasAtlasSign in

Fifty years of the Curitiba bus rapid transit network

evidence

Supports the 1974 opening of the first twenty kilometres, the structural-axis planning model, the diffusion to roughly two hundred cities, and the ridership fall to just over 710,000 daily in 2020 with recovery to about 1.1 million in 2022. V55 verification basis: retrieved from anniversary reporting and policy material rather than from URBS or municipal statistics, which were not opened.

A evidence is not a place. Drawing it on a map would assert something about the world that no stored fact supports.

Evidence · 0

This object cites no evidence.

Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 0
    Assembled narrative · 0

    This object does not clear the publishing floor: an assembled narrative needs a description and at least one cited piece of evidence.

    Observed changes · 0

    No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

    Actions

    Read the assembled narrativeThis object has no public Experience: one needs a description and at least one cited piece of evidence.Continue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

    /atlas?object=EVIDENCE_EV_CURITIBA_BRT