Electricity Grids and Secure Energy Transitions
evidence
Supports the finding that grid investment and permitting, rather than generation cost, has become a binding constraint on deployment, including the estimate that on the order of eighty million kilometres of grid must be added or refurbished by 2040 and that over a terawatt of projects sit in advanced-stage interconnection queues. V55 verification basis: not retrieved in this session; both figures are stated from author knowledge of the report and are flagged as unchecked on the citing object.
A evidence is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Evidence · 0
This object cites no evidence.
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 0
Assembled narrative · 0
This object does not clear the publishing floor: an assembled narrative needs a description and at least one cited piece of evidence.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVIDENCE_EV_IEA_ELECTRICITY_GRIDS_2023