Red Sea cable damage, 2024 and 2025
evidence
Supports the 2024 and 2025 Red Sea incidents as described here: the cables reported affected, the assessed anchor-drag mechanism in 2024 with ICPC comment, the 05:45 UTC start of the September 2025 latency effects, and Microsoft's statement that traffic previously routed through the Middle East would see higher latency. V55 verification basis: contemporaneous journalism retrieved in summary, not primary incident reports. Cause attribution for the 2024 damage is an assessment, not a finding; the Houthi movement denied involvement in the 2025 cuts and no cause has been established here.
A evidence is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Evidence · 0
This object cites no evidence.
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 0
Assembled narrative · 0
This object does not clear the publishing floor: an assembled narrative needs a description and at least one cited piece of evidence.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.
Actions
/atlas?object=EVIDENCE_EV_RED_SEA_CABLE_INCIDENT_REPORTING