Skip to content
RichseenAtlasAtlasSign in

Electrification of the Trans-Siberian is completed

node

Work begun in 1929 finishes in 2002, seventy-three years later. The line the wires now follow is the line surveyed for steam locomotives in the 1890s: the traction changed twice, the alignment did not. It is the cleanest illustration available of which parts of a railway are replaceable and which are effectively permanent.

A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 2
Assembled narrative · 1

An assembled narrative is available for this object.

Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=EVT_TRANS_SIBERIAN_ELECTRIFIED_2002