Skip to content
RichseenAtlasAtlasSign in

The Ghan runs through to Darwin for the first time

node

The extension north from Alice Springs having opened in January 2004, the first through service leaves Adelaide on 1 February and arrives at Darwin on 3 February, completing a south-to-north crossing of the continent first proposed in the nineteenth century. It is the only route in this Journey whose principal alignment is younger than the passengers riding it.

A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.

Read in · 1

Evidence · 1
Timeline

No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.

Connections · 1
Assembled narrative · 1

Assembled from 13 blocks · 1 evidence · 8 related

  1. Story
  2. The extension north from Alice Springs having opened in January 2004, the first through service leaves Adelaide on 1 February and arrives at Darwin on 3 February, completing a south-to-north crossing of the continent first proposed in the nineteenth century. It is the only route in this Journey whose principal alignment is younger than the passengers riding it.
  3. Knowledge
  4. The Ghan
  5. The Ghan runs through to Darwin for the first time
  6. Connections
  7. The Ghan
  8. Track gauge as a colonial decision
  9. The Ghan begins running on the Central Australia Railway
  10. The last narrow-gauge Ghan leaves Marree
  11. The Ghan runs through to Darwin for the first time
  12. Evidence
  13. Supports the Central Australia Railway as the Ghan's original 1,067 mm narrow-gauge alignment from 1929, its replacement by a standard-gauge line via Tarcoola in 1980, and the 2004 Darwin extension. V55 verification basis: the library collection was identified as an authority and the chronology was carried in attributed Australian rail-history summaries; slsa.sa.gov.au was not fetched.
Close the narrative
Observed changes · 0

No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.

Actions

Read the assembled narrativeContinue in StudioOpen TwinTwin does not start a decision from this kind of object.ShareSaveSaved objects are part of the authenticated projection, which is declared and not yet built.

/atlas?object=EVT_GHAN_REACHES_DARWIN_2004&experience=EVT_GHAN_REACHES_DARWIN_2004