The Severomuysky Tunnel opens under the BAM's worst obstacle
node
The 15.3 km tunnel enters service after roughly twenty-six years of intermittent construction, removing the steep temporary bypass that had capped train weights across the whole Baikal–Amur Mainline. Sources retrieved for this pack disagree on the date: one gives 12 May 2003, another December 2003. The disagreement is recorded rather than resolved.
A node is not a place. Drawing it on a map would assert something about the world that no stored fact supports.
Read in · 1
Evidence · 1
Timeline
No dated observations are stored for this object. Atlas shows what was observed and when — it does not infer a history.
Connections · 3
- Severomuysky Tunnelconcerns
- Baikal–Amur Mainline (BAM)concerns
- Ruling gradientconcerns
Assembled narrative · 1
Assembled from 25 blocks · 1 evidence · 22 related
- Story
- The 15.3 km tunnel enters service after roughly twenty-six years of intermittent construction, removing the steep temporary bypass that had capped train weights across the whole Baikal–Amur Mainline. Sources retrieved for this pack disagree on the date: one gives 12 May 2003, another December 2003. The disagreement is recorded rather than resolved.
- Knowledge
- Baikal–Amur Mainline (BAM)
- Severomuysky Tunnel
- Ruling gradient
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Connections
- Severomuysky Tunnel
- Baikal–Amur Mainline (BAM)
- Ruling gradient
- Baikal–Amur Mainline (BAM)
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Trans-Siberian Railway
- Permafrost as a track foundation
- Severomuysky Tunnel
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Trans-Siberian Railway
- Canadian Pacific transcontinental main line
- The main-line steam locomotive
- The last spike is driven at Craigellachie
- The Spiral Tunnels open and the Big Hill is retired
- The Severomuysky Tunnel opens under the BAM's worst obstacle
- Evidence
- Supports the BAM's route, its permafrost exposure and the 15.3 km Severomuysky Tunnel as the longest railway tunnel in Russia. V55 verification basis: RZD's page was returned as a search result and its substance carried in the attributed summary; it was not fetched. RZD is the operator and therefore an interested party for anything about the line's performance.
Observed changes · 0
No public Signals are attached to this object. Signals show what changed and when it was observed — never a direction or a rank.